破碎機(jī)篩網(wǎng)更換及緊固方式

  • 作者:管理員
  • 發(fā)布時(shí)間:2025-05-24

破碎機(jī)篩網(wǎng)更換及緊固方式

1、首先平移進(jìn)料皮帶輸送機(jī),留出換網(wǎng)空間,方便更換篩網(wǎng)。


2、用內(nèi)六角扳手逆時(shí)針擰開下料斗下方固定螺絲,然后平移抽出破碎機(jī)下料口。


3、先用適當(dāng)規(guī)格內(nèi)六角扳手沿逆時(shí)針拆卸3顆黑色內(nèi)六角螺絲,依次取出加厚墊片。


4、用大力鉗逆時(shí)針拆卸,固定篩網(wǎng)的尖頭絲桿4個(gè)。


5 、篩網(wǎng)調(diào)節(jié)桿,逆時(shí)針退100mm行程,篩網(wǎng)托架下移,即可取出篩網(wǎng)舊件。


6、更換新篩網(wǎng),需用叉車或者手動(dòng)液壓車輔助安裝,將篩網(wǎng)放至篩網(wǎng)托架上。


7、將篩網(wǎng)調(diào)節(jié)桿順時(shí)針轉(zhuǎn)動(dòng),篩網(wǎng)托架會(huì)逐步升起,如遇到卡頓現(xiàn)象,請(qǐng)勿繼續(xù)轉(zhuǎn)動(dòng)篩網(wǎng)調(diào)節(jié)桿,逆時(shí)針轉(zhuǎn)動(dòng)篩網(wǎng)調(diào)節(jié)桿半圈,使用撬棒之類的工具,撬動(dòng)篩網(wǎng)直至篩網(wǎng)處于活動(dòng)狀態(tài),繼續(xù)順時(shí)針轉(zhuǎn)動(dòng)篩網(wǎng)調(diào)節(jié)桿,直至篩網(wǎng)到達(dá)合適的位置,需要檢查篩網(wǎng)托架與篩網(wǎng)匹配度,±1-2mm,如果篩網(wǎng)與篩網(wǎng)托架匹配,均勻無縫隙。最后再依次順時(shí)針轉(zhuǎn)動(dòng)固定篩網(wǎng)的箭頭絲桿,篩網(wǎng)安裝完畢。


8、將破碎機(jī)下料口平移推進(jìn)破碎機(jī)至合適位置,固定好螺栓,最后將輸送帶平移至破碎機(jī)進(jìn)料口即可。


9、如果不匹配,需要做好記號(hào),調(diào)整篩網(wǎng)弧度。建議用折彎?rùn)C(jī)或者錘子調(diào)整,調(diào)整完之后,重復(fù)第七步和第八步即可。


Crusher Screen Replacement and Tightening Method 


1、  First, move the feed belt conveyor horizontally to leave space for screen replacement, making it convenient for screen change.


2、  Use an Allen wrench to unscrew the fixing screws below the discharge hopper counterclockwise, then move and pull out the lower discharge port of the crusher.


3、use Allen wrench to unscrew three black Allen screws counterclockwise, then sequentially remove the thick washers.


4、  Use a heavy-duty vice to unscrew in a counterclockwise direction, removing the four pointed screw rods that fix the sieve mesh.


5、  The sieve adjustment rod should be retreated 100mm in a counterclockwise direction, causing the sieve tray to lower, thus allowing the old sieve mesh to be removed.


6、To replace the new sieve mesh, assistance from a forklift or manual hydraulic truck is required. Place the new sieve mesh onto the sieve tray.


7、  Adjust the sieve mesh regulating rod clockwise. The sieve mesh tray will rise. If you encounter any jamming, do not continue to turn the sieve mesh regulating rod. Instead, turn it counterclockwise by half a turn and use a crowbar or similar tool to lift the sieve mesh until it is in a movable state. Then, continue to turn the sieve mesh regulating rod clockwise until the sieve mesh reaches the appropriate position. You need to check the fit between the sieve mesh tray and the sieve mesh, ensuring it is within ±1-2mm and that there are no gaps. Finally, turn the arrow screw fixing the sieve mesh clockwise . The sieve mesh installation is complete.


8、Shift the discharge outlet of the crusher forward to position the crusher at the appropriate location, tighten the bolts, and then move the conveyor belt to align with the crusher's feed inlet.


9、If there is a mismatch, mark the necessary adjustments and modify the screen mesh curvature. It is recommended to use a bending machine or a hammer for this. After making the adjustments, repeat step 7 and 8